    A time study was conducted on a  job that contains four elements. The oserved times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes and the elements are performed successively by the single worker fo form the cycle. Assume that one product is produced at the end of each sycle.

    please check attached file for complete details of this question